Notification from the government of Karnataka modifying the buffers around storm water drains (SWDs) in Bengaluru.
Lake buffer continues to be governed by KTCDA rules.
Documents for an elevated rotary flyover constructed at IOC junction also including additional two-lanes Railway Over Bridge at Baiyappanahalli Railway level crossing.
Impact Evaluation of the Five Guarantees of the Government of Karnataka is an independent report published by Tara Krishnaswamy, independent policy consultant with Lokniti-Centre for the Study of Developing Societies (CSDS) and Indus Action Initiatives.
The report was published in August 2025
KTCDA 2025 bill tabled in the legislature proposes to amend the existing KTCDA Act of 2014.
It proposes changes to the buffer zones and permitted activity in the buffer zones of the lakes.
Grant of permanent land 1862 sq mtrs (0.1862 Ha) and temporary land 1725 Sq Mtrs for one year (0.1725 Ha) of forest land in Sy No.38 of Uttarahalli Manavarthe Kaval Village, Bengaluru South Taluk, Bengaluru Urban District.
Documents pertaining to the peripheral ring road in Bengaluru.
The documents are from 2020 and obtained through RTI by D.T Devare of the Bangalore Environmental Trust